Free working document

The commission intake and stage approval checklist

Every commission dispute a designer ever has traces back to something on this list that nobody wrote down.

This is the list a bench studio runs through from the moment a client puts a grandmother ring on the tray to the moment a finished piece leaves in a box. It covers four stages: receiving a customer owned item, building a quote that holds, getting paperwork and deposit settled before any metal is cut, and taking written approval at each point where the build becomes hard to reverse.

None of it is theory. Each line exists because a designer somewhere lost money or a client relationship when it was skipped. Print it, keep it on the bench, and work through it in order. If you use BeadInvoice the same stages are already built into the job record, but the checklist stands alone and works with a clipboard and a pen.

Stage one: receiving a customer owned item

Stage two: building a quote that holds

Stage three: paperwork and money before metal moves

Stage four: approvals through the build

Email me the editable version

How to use it

Work it in order and do not let a stage begin while the previous one is unsigned. The temptation is always at stage three, when a client is enthusiastic and you want to get the metal on order before the weekend. That is precisely the point where designers end up funding a center stone for a stranger, and it is the easiest habit in this list to fix.

The list also doubles as a training document if you bring in help, and as a record if a piece ever goes to a claim. Keep the completed sheet with the job file for as long as your warranty runs, which for most studios means several years past delivery rather than a few months.

Send me the editable copy

Send it to your inbox as an editable sheet you can put your own studio name, shop rate and deposit terms on.

There is no newsletter attached to this. Your address sends the intake and approval checklist and nothing else, and if you would rather just ask something about a remount you are quoting this week, write to jimenezjulien42@gmail.com and a person at this end answers.

Questions about this document

Do I really need a signed receipt for a client stone?

Yes, every time, including for a client you have known for years. You are holding property that belongs to someone else and may be uninsured on your bench. A one page receipt with weights, condition notes and photos protects both of you and takes about four minutes.

What if a client will not sign an approval at the CAD stage?

Treat hesitation as information rather than an obstacle. Usually it means something in the design is still unsettled, and finding that now is much cheaper than finding it after casting. Keep the build paused until the approval arrives.

Can I use this checklist without BeadInvoice?

Yes. It is written to work on paper with a pen and a phone camera. Inside BeadInvoice the same stages are already part of the job record, with the intake photos, the quote and the approvals stored against the commission.

The four stages, already built into the job

Worked in order, this checklist stops the failures it was written for: the undocumented girdle chip, the metal priced last month, the verbal approval on a head style. Inside BeadInvoice those same four stages are the job record, so the intake weights, the deposit and each written sign off from CAD to final polish live in one place. Bring a commission you have open and we will run it through the stages together.